العربية
  • +971.508312274
  • أمريكا الشمالية الرقم المجاني

TESLA Assembly Line Facility

Client TESLA, Inc. Challenge Tesla needed to add additional production capacity immediately, for their new model 3 vehicle. Solution Tesla had two existing Sprung structures and decided that a 150’ wide x 915’ long Sprung structure was the fastest solution. Time-line: Delivery and Construction – 19 days Results An assembly line was constructed inside the …

Doyon Drilling

Client Doyon Drilling – Dead Horse Alaska (North Slope) Challenge Doyon is planning to build a new drilling rig to arrive on the North Slope of Alaska in 2019 and they needed a warm warehouse to receive rig components. The company was concerned about the costs associated with building on permafrost in the area. Solution …

Sprung Campus On-site Greenhouse

Client Sprung Campus in Calgary, Alberta ARK – Agro Resiliency Kit is an alliance of Sprung who operate the 4,200 sq m on-site greenhouse. Challenge Growing up to 17,000 plants 365 days a year for Sprung employees and local restaurants. Results Organic vegetables that are locally grown and free of pesticides in a year round …

Regina Food Bank – Light Deprived Greenhouse

Client Regina Food Bank and Co-op Challenge Regina Food bank needed to grow fresh produce for their clients year round. Solution 40′ wide by 65′ long Sprung Structure fully insulated light deprived greenhouse. Results The Regina Food Bank is best known as a place that collects and distributes food, and now is also growing its …

Alberta Tilapia Aquaponics

Client Alberta Tilapia Aquaponics Challenge Build a tilapia fish farm and combined it with aquaponics in Alberta, Canada. Aquaponics focuses on growing fish and produce together. Solution 50’ wide by 60’ long Sprung Structure with greenhouse membrane Results This year round greenhouse uses natural light to grow in combination with aquaponics. This facility has 25,000 …

Fresno Rescue Mission

Client Fresno Rescue Mission Challenge The Fresno Rescue Mission in Fresno, California, is a faith-based rehabilitation clinic. After 80 years in operation, they have been forced to relocate—their campus lies in the path of California’s High-Speed Rail project. The job cited modular trailers for kitchen, cafeteria, classroom, and office spaces, but, required alternative buildings to …

San Francisco Division Circle

    Client St. Vincent de Paul Society of San Francisco and The City of San Francisco Public Works Department Challenge The client needed to respond to San Francisco’s Mission neighborhood’s public health crisis, resulting from the drastic increase in tent encampments. The new Navigation Center needed to serve people living in encampments who have …

Mount Palomar Winery

Client Mount Palomar Winery, California Challenge Located on 315 beautiful acres in the heart of Temecula wine country, Mount Palomar Winery has been proudly growing and producing award-winning wines since 1969. After a gas explosion in their old banquet and exhibition space they needed to build a new structure quickly to serve their visitors. It …

Bloom Lake Mine

Client Bloom Lake Mine, Fermont, Quebec, Canada Challenge Bloom Lake Mines required a large water treatment plant for their operations. This mine needed a building solution that could be erected during cold winter months without a concrete foundation. Solution 140’ wide x 290’ long structure with a 35’ x 25’ connecting corridor, Tan Low Temperature …

Los Bronces Mine

Client Anglo American Mining Company – Los Bronces Mine, Chile Challenge At 4,200 meters above sea level in the Andes this mine site needed to protect equipment from the heavy snow load in this area. (The snow load in the location was 2000 kilos per square meter). Solution 42’ wide by 148’ long (12.9 m …

Page 1 of 21
Call