Client TESLA, Inc. Challenge Tesla needed to add additional production capacity immediately, for their new model 3 vehicle. Solution Tesla had two existing Sprung structures and decided that a 150’ wide x 915’ long Sprung structure was the fastest solution. Time-line: Delivery and Construction – 19 days Results An assembly line was constructed inside the …